The new draft London Plan:what the tiered affordable housing threshold means for your scheme

The draft London Plan includes a tiered system for affordable housing quotas, with thresholds of 35%, 25% or 20% depending on the borough. The plan also sets out a new house building target of 558,451 homes by 2037, which will be supported by the Mayor’s Spatial Development Strategy for Greater London.

Local authorities will now fall into one of three tiers, with 12 mainly central boroughs moving back to 35% affordable housing following last year’s cuts in affordable housing thresholds being cut to 20%.

A 25% affordable housing threshold will be applied to a further eight London Boroughs, with the remaining 13 boroughs on London’s outskirts staying on the new 20% rate.

Band Affordable housing threshold Reduced threshold available Boroughs
Band A35%25% with 100% social rent12 boroughs, mainly inner London plus Richmond upon Thames
Band B25%20% with at least 80% social rentBrent, Ealing, Greenwich, Haringey, Lewisham, Merton, Newham, Waltham Forest
Band C20%None13 outer London boroughs
Green Belt50%35% with significant transport infrastructureAll boroughs
Public sector land40%25% in limited casesAll boroughs
Industrial land35%NoneAll boroughs

Fast-Track Route vs Viability Tested Route: Which Applies to Your Development Now

Which route applies will depend on whether your scheme meets the relevant affordable housing threshold. Schemes that do can follow the fast-track route without viability evidence, while those that do not will follow the viability-tested route.

In October 2025, the government and the Mayor of London announced a package of time-limited emergency measures to support housebuilding in London, aimed at improving the viability of housing development in the near term and accelerating housing delivery, including social and affordable housing.

This includes a new time-limited planning route, enabling developers to secure permission without a viability assessment on private land where they commit to at least 20% social and affordable housing, with providers able to apply for GLA grant to support social and affordable homes above the first 10% of the total homes on the site. The route will be open to applications submitted and validated by 31 March 2028, by which time the new London Plan is expected to be adopted.

For developments of 10 to 35 units, the fast-track route (no viability evidence) would apply as follows:

  1. Green Belt = 50% affordable housing provision

  2. Non-Green Belt = 20% affordable housing provision

The fast-track route requires a 60/40 split between social rent and intermediate rent. Development following the fast-track route through planning should undergo an Early Stage Viability Review if substantial implementation of the scheme has not been made within two years, or a period agreed by the borough, of planning permission being granted. Under the time-limited emergency route, the early stage review is instead triggered if substantial implementation has not been reached within 30 months of permission, with 100% of any surplus paid to the borough.

Development following the viability-tested route will be subject to early, late and in some cases mid stage reviews, subject to certain timing requirements. The late stage review is normally triggered once 75% of the homes have been sold or occupied.

Section 106 vs CIL: How Developer Contributions are changing in 2026

The government announced a temporary and targeted partial relief from the Community Infrastructure Levy (CIL) for eligible schemes, with higher levels of relief for schemes providing more than 20% social and affordable housing. This emergency relief will now apply to eligible schemes commencing before 31 March 2030, with further simplified requirements and processes to access the relief and get schemes moving.

We understand that the Time Limited relief from the Community Infrastructure Levy in London was under consultation until 18th September 2026, and we will provide a further update once the outcome is published.

The draft London Plan, the time-limited emergency route and the proposed CIL relief will all affect how much affordable housing schemes need to provide, and the route they take through planning. With the new London Plan not expected to be adopted until early 2028, developers will need to think carefully about which route is most appropriate for their scheme, and when to submit. We will continue to monitor the draft London Plan as it progresses through examination, and will provide a further update once the outcome of the CIL relief consultation is published.

Contact Roscoe Group

Roscoe Group advises developers and landowners on planning viability, Section 106 agreements and affordable housing. If you would like to discuss how the draft London Plan or the emergency measures could affect your scheme, please get in touch with our team.

Frequently Asked Questions

Next
Next

Affordable Housing Thresholds in London: What Developers Need to Know